Yokogawa TSE200-075RT2

Reduced Tip, 1/2 inch NPT Threads, (Threaded Thermowell), U=075

Open Market / 45 Days

Yokogawa TSE100-105TW4

Tapered, Welded, 1 inch Pipe Size (Socket Weld Thermowell), U=105

Open Market / 45 Days

Yokogawa TSE100-135RT2

Reduced Tip, 1/2 inch NPT Threads, (Threaded Thermowell), U=135

Open Market / 45 Days

Yokogawa TSE100-165RT4

Reduced Tip, 1 inch NPT Threads, (Threaded Thermowell), U=165

Open Market / 45 Days

Yokogawa TSE100-165TT2

Tapered, 1/2 inch NPT threads, (Threaded Thermowell), U=165

Open Market / 45 Days

Yokogawa TSE100-165TT3

Tapered, 3/4 inch NPT threads, (Threaded Thermowell), U=165

Open Market / 45 Days

Yokogawa TSE200-025RT3

Reduced Tip, 3/4 inch NPT Threads, (Threaded Thermowell), U=025

Open Market / 45 Days

Yokogawa TSE200-025TT2

Tapered, 1/2 inch NPT threads, (Threaded Thermowell), U=025

Open Market / 45 Days

Yokogawa TSE200-025TT4

Tapered, 1 inch NPT threads, (Threaded Thermowell), U=025

Open Market / 45 Days

Yokogawa TSE200-165TT3

Tapered, 3/4 inch NPT threads, (Threaded Thermowell), U=165

Open Market / 45 Days

Yokogawa TSE200-165TT4

Tapered, 1 inch NPT threads, (Threaded Thermowell), U=165

Open Market / 45 Days

Yokogawa TSE300-025RW3

Reduced Tip, Welded, 3/4 inch Pipe Size (Socket Weld Thermowell), U=025

Open Market / 45 Days

Yokogawa TSE300-025TT4

Tapered, 1 inch NPT threads, (Threaded Thermowell), U=025

Open Market / 45 Days

Yokogawa TSE100-105RT4

Reduced Tip, 1 inch NPT Threads, (Threaded Thermowell), U=105

Open Market / 45 Days

Yokogawa TSE100-025RT4

Reduced Tip, 1 inch NPT Threads, (Threaded Thermowell), U=025

Open Market / 45 Days

Yokogawa TSE100-025RW3

Reduced Tip, Welded, 3/4 inch Pipe Size (Socket Weld Thermowell), U=025

Open Market / 45 Days

Yokogawa TSE100-025TT4

Tapered, 1 inch NPT threads, (Threaded Thermowell), U=025

Open Market / 45 Days

Yokogawa TSE100-045RT4

Reduced Tip, 1 inch NPT Threads, (Threaded Thermowell), U=045

Open Market / 45 Days

Yokogawa TSE100-045TT2

Tapered, 1/2 inch NPT threads, (Threaded Thermowell), U=045

Open Market / 45 Days

Yokogawa TSE100-045TT3

Tapered, 3/4 inch NPT threads, (Threaded Thermowell), U=045

Open Market / 45 Days

Yokogawa TSE100-045TW4

Tapered, Welded, 1 inch Pipe Size (Socket Weld Thermowell), U=045

Open Market / 45 Days

Yokogawa TSE100-070TF4

Tapered, 1.0 inch (Flanged Thermowell, Raised Face), U=070

Open Market / 45 Days

Yokogawa TSE100-070TF6

Tapered, 1.5 inch (Flanged Thermowell, Raised Face), U=070

Open Market / 45 Days

Yokogawa TSE200-040RF4

Reduced Tip, 1.0 inch (Flanged Thermowell, Raised Face), U=040

Open Market / 45 Days

Yokogawa TSE200-040TF8

Tapered, 2.0 inch (Flanged Thermowell, Raised Face), U=040

Open Market / 45 Days

Yokogawa TSE200-045RT3

Reduced Tip, 3/4 inch NPT Threads, (Threaded Thermowell), U=045

Open Market / 45 Days

Yokogawa TSE200-045RT4

Reduced Tip, 1 inch NPT Threads, (Threaded Thermowell), U=045

Open Market / 45 Days

Yokogawa TSE200-045RW3

Reduced Tip, Welded, 3/4 inch Pipe Size (Socket Weld Thermowell), U=045

Open Market / 45 Days

Yokogawa TSE200-045TT3

Tapered, 3/4 inch NPT threads, (Threaded Thermowell), U=045

Open Market / 45 Days

Yokogawa TSE200-045TT4

Tapered, 1 inch NPT threads, (Threaded Thermowell), U=045

Open Market / 45 Days

Yokogawa TSE300-165TT2

Tapered, 1/2 inch NPT threads, (Threaded Thermowell), U=165

Open Market / 45 Days

Yokogawa TSE300-045RT4

Reduced Tip, 1 inch NPT Threads, (Threaded Thermowell), U=045

Open Market / 45 Days

Yokogawa TSE300-045RW3

Reduced Tip, Welded, 3/4 inch Pipe Size (Socket Weld Thermowell), U=045

Open Market / 45 Days

Yokogawa TSE300-070RF6

Reduced Tip, 1.5 inch (Flanged Thermowell, Raised Face), U=070

Open Market / 45 Days

Yokogawa TSE300-070RF8

Reduced Tip, 2.0 inch (Flanged Thermowell, Raised Face), U=070

Open Market / 45 Days

Yokogawa TSE300-075RT3

Reduced Tip, 3/4 inch NPT Threads, (Threaded Thermowell), U=075

Open Market / 45 Days

Yokogawa TSE300-075RT4

Reduced Tip, 1 inch NPT Threads, (Threaded Thermowell), U=075

Open Market / 45 Days

Yokogawa TSE300-075TT2

Tapered, 1/2 inch NPT threads, (Threaded Thermowell), U=075

Open Market / 45 Days

Yokogawa TSE300-100TF8

Tapered, 2.0 inch (Flanged Thermowell, Raised Face), U=100

Open Market / 45 Days

Yokogawa TSE200-040RF6

Reduced Tip, 1.5 inch (Flanged Thermowell, Raised Face), U=040

Open Market / 45 Days

Yokogawa TSE200-040TF6

Tapered, 1.5 inch (Flanged Thermowell, Raised Face), U=040

Open Market / 45 Days

Yokogawa TSE200-070RF6

Reduced Tip, 1.5 inch (Flanged Thermowell, Raised Face), U=070

Open Market / 45 Days

Yokogawa TSE300-165RT2

Reduced Tip, 1/2 inch NPT Threads, (Threaded Thermowell), U=165

Open Market / 45 Days

Yokogawa TSE200-040TF4

Tapered, 1.0 inch (Flanged Thermowell, Raised Face), U=040

Open Market / 45 Days

Yokogawa TSE200-070RF4

Reduced Tip, 1.0 inch (Flanged Thermowell, Raised Face), U=070

Open Market / 45 Days

Yokogawa TSE300-160TF8

Tapered, 2.0 inch (Flanged Thermowell, Raised Face), U=160

Open Market / 45 Days

Yokogawa TSE300-165RT4

Reduced Tip, 1 inch NPT Threads, (Threaded Thermowell), U=165

Open Market / 45 Days

Yokogawa TSE300-045TT2

Tapered, 1/2 inch NPT threads, (Threaded Thermowell), U=045

Open Market / 45 Days

Yokogawa TSE300-165TT3

Tapered, 3/4 inch NPT threads, (Threaded Thermowell), U=165

Open Market / 45 Days

Yokogawa TSE300-045RT3

Reduced Tip, 3/4 inch NPT Threads, (Threaded Thermowell), U=045

Open Market / 45 Days